NHHIP 3D VISUALIZATIONS

The visualizations for Segment 1 and Segment 2 that can be viewed below are based on the design schematics shown at the May 2017 public hearing. The design schematics were revised after the public hearing and the updated design schematics can be viewed here: Design Schematics (December 2019). The visualization for Segment 3 that can be viewed below is based on the December 2019 design schematic. If the embedded videos do not work, please click the title of the video to download it.

Segment 1 Visualization (2017) - I-45 from Crosstimbers St. to W. Gulf Bank Rd.
  
  
Segment 1 Visualization (2017) - I-45 from W. Gulf Bank Rd. to Beltway 8 North Interchange
  
  
Segment 2 Visualization (2017) - I-45 from I-10/Quitman St. to I-610 Interchange
  
  
Segment 3 Visualization (2020) - Downtown Loop System